欧美性猛交XXXX,精品人妻码一区二区三区,精品无码一区二区三区在线,亚洲爆乳AAA无码专区

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.afonec.net/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 公司新聞

通道及施工電梯防護(hù)棚要求要求

來源:http://www.afonec.net/   發(fā)布時間:2021-11-18

1塔吊半徑以內(nèi)所有后臺制作加工、攪拌區(qū)必須搭設(shè)雙層防護(hù)棚。

1. All backstage fabrication, processing and mixing areas within the radius of tower crane must be provided with double-layer safety protection sheds.
2.操作場所掛設(shè)的標(biāo)志牌有:機械驗收合格牌、警示牌、操作規(guī)程。標(biāo)牌 的掛設(shè)高度為離地面 2.6 m標(biāo)志牌規(guī)格為寬600mm*高800mm.
2. The signboards hung at the operation site include: Qualified Mechanical acceptance board, safety warning board and operation procedures. The hanging height of the sign is 2.6 m above the ground, and the specification of the sign is 600mm wide * 800mm high
3.地面必須進(jìn)行砼硬化厚200mm,設(shè)置4L滅火器 2 只。開關(guān)箱與機械的水平 間距不得大于 3 m。
3. The ground must be hardened with concrete thickness of 200mm, and 2 4L fire extinguishers shall be set. The horizontal distance between the switch box and the machinery shall not be greater than 3 m.
4.雙層防護(hù)棚,兩層之間高度800mm,面層用噴繪布噴繪制成,正面為防護(hù) 棚名稱和標(biāo)志牌,其余三面采 用警示標(biāo)語。
4. The double-layer protective shed has a height of 800mm between the two layers. The surface layer is made of spray-painted cloth. The front side is the name of the protective shed and safety signs, and the other three sides are provided with safety warning slogans.
木工加工棚
5.加工棚名稱及標(biāo)語字高為400mm,長度根據(jù)尺寸現(xiàn)場均勻布置。
5. The name of the processing shed and the safety slogan are 400mm high, and the length is evenly arranged on site according to the size.
6.標(biāo)志牌:寬 400mm*高500mm
6. Safety signboard: 400mm wide * 500mm high
7.基礎(chǔ)施工前應(yīng)先視現(xiàn)場地質(zhì)情況做地基處理,處理方法可采用夯實、換填石 料等,必須保證其密實度
7. Before foundation construction, foundation treatment shall be carried out according to the site geological conditions. The treatment methods can be tamping, replacement of stones, etc., and its compactness must be ensured
8.立桿采用22#工字鋼立柱刷紅色油漆,每榀寬度5m,高3m。如施工現(xiàn)場場地不足,可以按5m每榀自行調(diào)整做法,但須經(jīng)現(xiàn)場技術(shù)人員同意。
8. The vertical pole adopts 22# I-steel, and the column is painted with red paint. Each frame is 5m wide and 3M high. If the construction site is insufficient, the method can be adjusted according to 5M each frame, but it must be approved by the on-site technicians.
9.圖中標(biāo)注為焊接的地方如無特殊說明的,均作滿焊處理 ,現(xiàn)場安裝前應(yīng)對各 構(gòu)件焊接質(zhì)量進(jìn)行驗收
9. The places marked as welding in the drawing shall be fully welded unless otherwise specified. The welding quality of each component shall be accepted before on-site installation
10.鋼筋加工機具應(yīng)獨立配置開關(guān)箱,開關(guān)箱中心離地面高度為1.5m. 11.軟弱基礎(chǔ)及受臺風(fēng)影響地區(qū)須增設(shè)拉錨。
10. Rebar processing machines and tools shall be equipped with switch box independently, and the height from the center of the switch box to the ground shall be 1.5m. 11. Pull anchors shall be added in weak foundation and typhoon affected areas.

成人试看120秒体验区| 99RE热这里只有精品视频| 人妻熟妇乱又伦精品视频APP| 狠狠色噜噜狠狠狠狠97首创麻豆 | 国产亚洲精品精华液| 天天噜日日噜狠狠噜免费| 精品一区二区三区无码AV| 息与子猛烈交尾在线播放 | 校花的凌羞辱日记高H女女| 国产精品18久久久久久白浆. | 民工把我奶头掏出来了怎么办 | 扒开腿狂躁女人爽出白浆A片| 顶级少妇倣爱A片XXX| 69久久无码一区人妻A片| 国产对白嫖老妇搡老太| JIZZJIZZ国产免费A片| 无码少妇精品一区二区免费动态 | 亚洲GV猛男GV无码男同网站| 最近中文字幕完整视频高清1| 牛鞭进入女人下身的视频| 一本久道中文无码字幕AV| 日本少妇做爰全过程| 欧美日韩国产精品自在自线| 大地影院HD免费高清完整版| 久久自己只精产国品| 亚洲AV无码国产综合专区| 女人高潮久久久叫人喷水| 国产CHINESE男男GAY| 狠狠夜色午夜久久综合热| 国产精品乱码一区二三区| 玩弄小少爷H窑子开张了| 青青久久久久精品亚洲AV中文| 国产午夜精品一区二区三区不卡| 无遮挡A级毛片免费看| 51国偷自产一区二区三区| 男女18禁啪啪无遮挡激烈网站| 人人爽人人爽人人片AV| 夜夜高潮夜夜爽夜夜爱爱一区| 亚洲欧美SUV精品| 星空影院在线观看完整版免费高清 | 亚洲丰满爆乳熟女在线观看|