施工鋼筋加工棚的作用及相關(guān)案例

來(lái)源:http://www.afonec.net/   發(fā)布時(shí)間:2022-07-19

施工鋼筋加工棚是在木工加工場(chǎng)地、鋼筋加工場(chǎng)地等上方有可能掉落物件或處于起重機(jī)調(diào)桿回轉(zhuǎn)范圍之內(nèi),應(yīng)搭設(shè)雙層防護(hù)棚。施工鋼筋加工棚就是施工現(xiàn)場(chǎng)保護(hù)施工人員,用鋼管作為支撐骨架,上面覆蓋竹串片或者竹笆板或者廢模板作為防砸,或者保護(hù)防護(hù)棚內(nèi)經(jīng)過(guò)的諸如高壓線之類(lèi)的東西,一般的雙層防護(hù)是為了加大系數(shù)。
The construction reinforcement processing shed is above the woodworking processing site and reinforcement processing site, where objects may fall or are within the rotation range of the crane adjusting rod. A double-layer protective shed should be set up. The construction reinforcement processing shed is to protect the construction personnel at the construction site, use steel pipes as the support framework, and cover bamboo strips or bamboo fence boards or waste templates as anti smashing, or protect things such as high-voltage lines passing through the protective shed. The general double-layer protection is to increase the safety factor.
施工鋼筋加工棚長(zhǎng)和寬尺寸,要根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6*9m、6*12米、9*12m等幾種,可以根據(jù)實(shí)際情況酌情采用,也可自行設(shè)計(jì)長(zhǎng)寬尺寸。
The length and width of the construction reinforcement processing shed should be determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6*9m, 6*12m, 9*12m and so on, which can be adopted according to the actual situation, or the length and width can be designed by ourselves.
同時(shí),現(xiàn)場(chǎng)鋼筋加工棚一般需根據(jù)施工籌備計(jì)劃,安置鋼筋對(duì)焊機(jī)、切斷機(jī)、彎曲機(jī)、調(diào)直機(jī)等設(shè)備的數(shù)量及加工流水線;另還需考慮部分鋼筋原材料、加工后鋼筋的周轉(zhuǎn)及堆放;現(xiàn)場(chǎng)施工場(chǎng)地、用電等條件來(lái)確定;故鋼筋加工棚一般跨度在12~18m,,長(zhǎng)度盡可能大于30m。
At the same time, the reinforcement processing shed on site generally needs to arrange the number of reinforcement butt welding machines, cutting machines, bending machines, straightening machines and other equipment and processing lines according to the construction preparation plan; In addition, it is also necessary to consider the turnover and stacking of some reinforcement raw materials and processed reinforcement; On site construction site, electricity and other conditions; Therefore, the reinforcement processing shed generally has a span of 12~18m and a length of more than 30m as far as possible.
鋼筋加工棚
Reinforcement processing shed case:
立柱:采用150mmX150mmX3mm方鋼管,中心間距4.15m,立柱焊接滿(mǎn)焊地面預(yù)埋鋼板上,立柱高3.2m,鋼筋棚立柱用方鋼管?chē)娡侩p色漆,底漆使用防銹漆一遍,面漆使用黃、黑兩種漆,自底部刷黑漆,向上每間隔50cm交替使用黃、黑漆,共刷兩遍。
Column: 150mmx150mmx3mm square steel pipe is used, with a center spacing of 4.15M. The column is fully welded to the ground embedded steel plate, and the column height is 3.2m. The column of the reinforcement shed is sprayed with two-color paint with square steel pipe, one coat of antirust paint is used for the primer, and two coats of yellow and black paint are used for the finish. Black paint is applied from the bottom, and yellow and black paint are applied alternately every 50cm upward, a total of two coats.
支架:橫向采用40mmX60mmX3.5mm方鋼管,跨度12m(兩端各懸挑1m),與立柱焊接,支架與立柱斜撐使用40mmX60mm方鋼管連接,支架與屋頂脊梁連接使用40mmX60mmX3.5mm方鋼管,支架底漆使用防銹漆--遍,面漆使用鐵紅漆兩遍。
Support: 40mmx60mmx3.5mm square steel pipe is used horizontally, with a span of 12m (1m overhanging at both ends). It is welded with the column. 40mmx60mm square steel pipe is used to connect the support with the column diagonal brace, 40mmx60mmx3.5mm square steel pipe is used to connect the support with the roof ridge, antirust paint is used for the primer of the support, and iron red paint is used for the surface paint twice.
脊梁:橫向采用40mmX60mmX3.5mm方鋼管,與立柱、支架焊接,并兩端做懸挑,懸挑長(zhǎng)度20cm。縱向采用C型鋼50mmX80mm,共11道,刷漆兩道,底漆使用防銹漆-遍,面漆使用鐵紅漆兩遍。
Spine: 40mmx60mmx3.5mm square steel pipes are used horizontally, welded with columns and supports, and cantilever is made at both ends, with a cantilever length of 20cm. C-shaped steel 50mmx80mm is used longitudinally, a total of 11 courses, two coats of paint, one coat of antirust paint for primer and two coats of iron red paint for finish.
施工鋼筋加工棚的作用及相關(guān)案例的問(wèn)題就講解完畢了,您有需求或者有問(wèn)題的話(huà)可關(guān)注我們網(wǎng)站http://www.afonec.net隨時(shí)來(lái)向在線客服咨詢(xún)了解。
The role of the construction reinforcement processing shed and the problems of relevant cases are explained. If you have needs or problems, you can follow our website http://www.afonec.net Feel free to consult online customer service.

久久精品人妻无码一区二区三区| 我和小峓子做爰HD完整版| 粗大挺进朋友人妻淑娟| 大内密探之零零性性| 色欲午夜无码久久久久久AV无码| 又粗又硬进去好爽A片| 成免费CRM在线看| 寡妇两腿间黑黑的毛| BDSM变态狂极端妓女| 穿成小奶娃各种做肉高H| 午夜欧美日韩精品久久久久久| 无码人妻AV一二区二区三区| 大学生高潮无套内谢视频| 免费无码VA一区二区三区| HEYZO无码中文字幕人妻| 无码无套少妇毛多18P| 男女猛烈激情XX00免费视频| 无码国产精品一区二区人妻| WWW国产精品内射| 边做饭时猛然进入高H| 久久AV无码精品人妻糸列| 帅气体育生GARY网站MV视频| 男男GAY做爽爽的视频| 欧美熟妇大荫蒂高潮视频| 大学生高潮无套内谢视频| 亚洲VA国产VA天堂VA久久| 打屁股羞耻扒开撅着| 亚洲人成网站999久久久综合| 野外玩弄大乳孕妇| 久别的草原在线影院电影观看中文| 狠狠色婷婷久久一区二区| 农村熟妇高潮精品A片| 亚洲日韩精品无码AV海量| 日文中字乱码一二三区别在哪里 | 成人免费视频在线观看| 秘书被老板CAO到合不拢腿| 久久久久国产精品免费免费搜索| 中国XXXXXLMEDJYF| 无码国精品一区二区免费| 欧美69久成人做爰视频| 大香煮伊区一二三四区2021|