欧美性猛交XXXX,精品人妻码一区二区三区,精品无码一区二区三区在线,亚洲爆乳AAA无码专区

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.afonec.net/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

鋼筋加工棚的8點(diǎn)安裝事項(xiàng)

來源:http://www.afonec.net/   發(fā)布時(shí)間:2023-02-17

鋼筋加工棚是施工現(xiàn)場(chǎng)鋼筋調(diào)直、彎曲和焊接的場(chǎng)所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對(duì)接,(不要擰14個(gè)螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個(gè)螺絲)。否則,支架的孔沒有對(duì)齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個(gè)螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時(shí),確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個(gè)2.99米鉆尾,鋼筋加工棚4個(gè)2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.afonec.net咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://www.afonec.net consulting service

亚洲精品乱码久久久久久直播| 疯狂的交换1—6真实交换3和2| 久久久久亚洲AV无码专区首页| 精品亚洲一区二区三区四区五区| 窝窝午夜精品一区二区| 老熟妇色XXXX老妇多毛| 精品无码久久久久久尤物| 厨房掀起少妇裙子挺进去| 日本无码色情三级播放| 狠狠综合久久AV一区二区| 精品国产精品久久一区免费式| 丝袜老师张开腿任我玩弄| 久久免费看少妇高潮A片特黄 | 妺妺窝人体色WWW美女| 成人无遮挡18禁免费视频| 体育老师在单杠C了我一节课 | 冢庭亂倫自拍的小視頻| 久久精品麻豆日日躁夜夜躁| 少妇极品熟妇人妻高清性色AV| 每次和儿子一起睡觉就睡不着| 无码爽死成人777在线观看网站| 18禁白丝喷水视频WWW视频| 老女人重囗味456| 亚洲熟妇少妇任你躁在线观看无码| 国产精品无码亚洲AV一区| 被学长抱进小树林C个爽| 亚洲国产婷婷香蕉久久久久久| 99久久精品国产| 精品无码一区二区三区亚洲桃色| 午夜无码熟熟妇丰满人妻| 少妇把腿扒开让我添| 亚洲精品无码| 蜜臀AV色欲A片无码精品一区| 国产真实强被迫伦姧女在线观看| 99久久人人爽亚洲精品美女| 熟女精品视频一区二区三区| 欧美成人精品一区二区免费| 国偷自产一区二区免费视频| 偷偷鲁2020精品偷拍视频| 男生把手放进我内裤揉摸好爽| 欧美一区二区三区啪啪|